• #29: Underkeel Clearance: Quantifying demand for USACE dredging

  • Jul 31 2024
  • Durée: 39 min
  • Podcast

#29: Underkeel Clearance: Quantifying demand for USACE dredging

  • Résumé

  • The ships calling upon U.S. ports have grown larger, and navigation channels must be dredged to greater depths to handle them. However, dredging is expensive, and the U.S. Army Corps of Engineers (USACE) needs more data-driven tools to prioritize limited resources more efficiently. Responding to this need, ERDC developed Underkeel Clearance. Applying newly available ship location data and combining it with other data points, this metric directly measures how often ship keels approach the bottom of a channel. By analyzing how ships are using the dredging USACE already provides and highlighting the areas with the highest volume of ships with limited clearance, Underkeel Clearance gives USACE waterway managers new insight to better quantify channel maintenance requirements. The project falls under the USACE Coastal Inlets Research Program. We discuss Underkeel Clearance with Dr. David Young and Dr. Brandan Scully, research civil engineers at ERDC’s Coastal and Hydraulics Laboratory. Topics include how dredging decisions have traditionally been made (3:07), how Underkeel Clearance can improve this methodology (5:33) and surprises that have emerged as researchers began analyzing Underkeel Clearance data (14:46). We also talk about how this tool could change USACE dredging operations (17:23), other use cases of this data (21:32) and what the future holds for the effort (33:47). For more information on the Power of ERDC podcast, visit https://www.PowerofERDCPodcast.org.
    Voir plus Voir moins
activate_Holiday_promo_in_buybox_DT_T2

Ce que les auditeurs disent de #29: Underkeel Clearance: Quantifying demand for USACE dredging

Moyenne des évaluations de clients

Évaluations – Cliquez sur les onglets pour changer la source des évaluations.